Page 281 - BOXFORD
P. 281

DEPARTMENT OF PUBLIC WORKS






















































                   The Topsfield Road drainage pipe is shown above.  It is located near the intersection with
                   Pinehurst Road.  The new pipe was installed in August 2016 during a one day shutdown
                   of Topsfield Road.   The DPW continues to replace deteriorated  drainage pipes
                   throughout the Town in accordance with a schedule 5 years ago via an engineering study
                   of the Town’s drainage systems.

                   The winter of 2016 was mild by New England standards.  However, during the not so
                   numerous ice and snow storms, the DPW applied sand and salt to the  Town roads to
                   provide safe travel for vehicles.

                   The DPW opened up its doors in June to the kindergartners, first and second graders from
                   Cole School. The children toured the garage area where the DPW personnel showed them



                                                             280
   276   277   278   279   280   281   282   283   284   285   286