SUMMARY OF BRIDGES

 Waterway


 Sl                   RUB        ROR          ROB           Grand
 no   ADEN   Box   Slab   Pipe   Arch   RCC/PSC   Girder   Steel   Girder   Composite   Girder   Mixed   TOTAL   LHS   Total   FOB   Total   Total




 1   ADEN/KRNT  59  412   85   2   14   5   1   18   596   39   0   0   635   14   6   20   655

 2   ADEN/KCG   18  229   24   52   3   10   0   40   376   3   0   0   379   23  30  53   432

 3   ADEN/NZB   14  179   36   16   7   0   0   51   303   25   0   0   328   5   6   11   339

 Grand Total   91  820  145  70   24   15   1   109  1275  67   0   0   1342  42  42  84   1426


   Summary of Important , Major and Minot Bridges


         Waterway
 Sl
 no   ADEN   Minor  Major   Important   TOTAL

 1   ADEN/KRNT   569   24   3   596

 2   ADEN/KCG   360   16   0   376


 3   ADEN/NZB   284   18   1   303
 Grand Total   1213   58   4   1275