Page 147 - Failure to Triumph - Journey of A Student
P. 147

Picture 4


















                                                         Picture 5


















                                                         Picture 6



  The first obstacle                FOR MORE JOIN ~ MISSION SSC / BANKING / UPSC

  The first obstacle of the PGT will normally be based on direct bridging. You will be able to connect
  the start line with first structure and connect the first structure with the finish line. It will be fairly

  easy and you must use both the rigid helping materials together and one by one all of you must pass
  through.  Make  sure  the  load  is  kept  on  the  plank/  balli  and  dragged  instead  of  carrying  them
  physically  as  it  is  generally  very  heavy.  Some  of  the  group  members  will  discourage  the  idea  of
  walking on the balli claiming it to be unstable or difficult as it is round. Insist on using it so that all
  can pass through faster and offer help by giving them a supporting hand.



  The second obstacle
   142   143   144   145   146   147   148   149   150   151   152