Page 17 - Industrial Technology EXTRA - 27th April 2020
P. 17

Finally,  as  any  piece  of  equipment  in  tidal  was asked to develop a suitable solution. The two
       turbines,  the  braking  system  must  comply  with  businesses successfully collaborated in the past on
       DNVGL–SE-0163  and  DNVGL-ST-0164  standards  a smaller 300 kW tidal turbine.
       to  ensure  it  meets  set  specifications  and  quality  During  this  project,  the  turbine  manufacturer
       benchmarks.                          was  impressed  with  the  Svendborg  Brakes’
                                            extensive experience in the production and supply of
       Designing an ideal braking system    advanced  braking  solutions,  even  to  the  most
       A leading producer of tidal turbines was building a  demanding industries.
       large 1 MW unit for installation at EMEC’s wave test  To  create  an  adequate  braking  system  for  the
       site in Billia Croo, off the west coast of Orkney. The  intended  application,  Svendborg  Brakes  worked
       manufacturer  wanted  a  regulatory-compliant,  closely with the tidal turbine OEM. By establishing
       advanced  braking  system  able  to  minimise  the  a  strong  collaboration  with  the  customer,  the
       effects of unexpected power or generator failures on  engineers  could  understand  what  key  design
       its operations. To address these needs, Svendborg  elements and functionalities were expected, thereby
       Brakes,  a  brand  of  Altra  Industrial  Motion  Corp.,  delivering a unique solution.

                           April 2020 • INDUSTRIAL TECHNOLOGY EXTRA! • p17
   12   13   14   15   16   17   18   19   20