Page 4 - Demo - Department Eastern Cape Education COLOSA SENIOR
P. 4
Demolish existing brick and mortar old ablution structures (17 x 2=33m2) BLOCK K & L
Old Ablution structures
Demolish existing block structures (32 x 2= 64m2) BLOCK I & J
Bad quality
Demolish existing zinc ablution structures (17 x 2= 33m2)
Old bad zinc toilets that are unusable
Demolish existing zinc ablution structures (12 x 3= 36m2)
Old bad zinc toilets that are unusable
Demolish existing zinc desk storage structures (81m2)
Bad Zinc structure
Demolish existing zinc nutrition structures (44m2)
Zinc structure
Demolish existing zinc nutrition structures (24m2)
Zinc structure been used for wood fire cooking
REPAIRS AND RENOVATIONS
Upgrade existing plastered brick classroom block structure ( 82m2) BLOCK H.
Upgrade existing face brick 4 x classroom block structure ( 240m2) BLOCK A.
Upgrade existing plastered brick 3 x classroom block structure (181m2) BLOCK F (portion).
Upgrade existing plastered brick five classroom block with mini office, store structure including structural cracks (242m2) BLOCK F
Upgrade existing face brick consumer classroom, principal office’s, clerk, printing room and science lab block structure (351m2) BLOCK D.
Upgrade existing plastered brick guard house block structure (10m2) BLOCK G and converted to caretaker room.
TEMPORAL STRUCTURES
Temporal classrooms (13No of 48m2) during construction ( Decanting)
Temporal computer classrooms (1No of 83m2) during construction (Decanting)
Temporal multi-purpose classrooms (1No of 83m2) during construction (Decanting)
3|Page