                        proponents to come up with this automated disinfection and sanitation system.


               i.  Replication of the project to another control borders in the municipality.

                       The  project  was  replicated  and  was  installed  at  Barangay  Dulop,  Dumingag,
               Zamboanga del Sur which is the boundary between Zamboanga del Sur and Zamboanga

               del Norte provinces. Another replication of the project was installed in the Department of

               Agriculture  compound,  Lower  Landing,  Dumingag,  Zamboanga  del  Sur  because  the
               compound was used as the Relief Goods Headquarter.



               j. Monitoring activities
                       The proponents had monitored and checked the devices and other peripherals

               from time to time for the whole duration of utilizing the DisinfecTENT. It took 3 months
               that the project was operationalize until the DOH issued advisory on the use of the misting

               process.