A post of one of the JHCSC faculty (former Faculty Trustee) recognizing the initiative of the
proponents to come up with this automated disinfection and sanitation system.
i. Replication of the project to another control borders in the municipality.
The project was replicated and was installed at Barangay Dulop, Dumingag,
Zamboanga del Sur which is the boundary between Zamboanga del Sur and Zamboanga
del Norte provinces. Another replication of the project was installed in the Department of
Agriculture compound, Lower Landing, Dumingag, Zamboanga del Sur because the
compound was used as the Relief Goods Headquarter.
j. Monitoring activities
The proponents had monitored and checked the devices and other peripherals
from time to time for the whole duration of utilizing the DisinfecTENT. It took 3 months
that the project was operationalize until the DOH issued advisory on the use of the misting
process.