Page 80 - New Allen Alliance Digital Book
P. 80

New Haven-Adams Township Community Center Park Project


                                      Nearly three decades of studies and investigation by the Park Board clearly   Impact:
                                      demonstrated  the  desire  of  residents  to  have  a  facility  that  would  provide  for   •   Providing a Regional Park for the benefit of residents in New Haven and Adams
                                      comprehensive and diversified programming all year.  In 2017, construction was   Township.
                                      completed on the Community Center which now provides the community with a   •   Building upon the successful components within the existing Community Center
                                      variety of amenities and programming.
                                                                                                  asset.
                    GRABILL           The intent of the master plan for the property surrounding the Community Center is   •   Providing new outdoor amenities for use by citizens and the Park and Recreation
                                      to simply build on the success of the Community Center and to be a grand example   Department through athletic leagues, event space, etc.
                    HARLAN            of the New Haven Parks and Recreation’s Vision: “Building the community and   •   Revitalizing space along the 930 corridor, and effectively catalyzing additional
                                                                                                  revitalization efforts along the corridor.
                                      increasing the quality of life through people, parks, and programs.”  The proposed
                                      improvements will provide a diverse range of amenities that offer recreational   •   Contributing to the synergy of investment near the Meadowbrook Rural Revival
                   HOAGLAND           opportunities  for  all  ages  that  will  assist  in  strengthening  the  community  and   Area including trail and sidewalk improvements, Kady Cove Senior Housing, and
                                      enhance the quality of life for all of those in the community.  Two sand volleyball   the East Allen County Schools Career and Technical Center.
                                      courts (with more in the future), four pickleball courts, and a basketball court provide   •   Implementation of Goal #4: Celebrate Community Identify and Quality of Life
                LEO-CEDARVILLE        the community opportunities for recreational games while also impacting the   Through Investment in Centers of Activity, Strategy 4.1 and 4.2 as part of the
                                      economic stability of the area by bringing people to the community for tournaments   NewAllen  New  Haven  Strategic  Investment  Plan,  2016  and  the  New  Haven-
                                      and  recreational  leagues.   The  inclusive  playground  will  also  provide  an  active   Adams Township Five-Year Master Plan, 2018.
                 MONROEVILLE          space for the young visitors of all abilities.  Parents watching children play can
                                      relax in the nearby plaza that offers shaded seating opportunities and can serve as   Readiness:
                                      outdoor gathering spaces for small or large groups.  These multi-functional spaces   •   Local Match Committed by City of New Haven,
                  NEW HAVEN           within the outdoor plaza provide the community with a unique amenity, an amenity   Allen County – Fort Wayne Capital Improvement Board
                                      that will have an infinite amount of programming potential for Parks and Recreation.    •   Red Flag Survey Complete: No Significant Environmental Issues Identified.
                  WOODBURN            Due to this extreme success, the needs of the Community Center continue to grow.    •  Preliminary Engineering Complete
                                                                                                •  No acquisition needed
                                      To accommodate some of these needs, the building will be expanded to incorporate   •  No permits needed
                                      additional restroom and locker room space.  These additional restrooms and locker   •  Income survey needed.  Adams Township LMI per the 2010 Census is 48%.
                                      rooms will also service the proposed outdoor spaces while providing a physical
                                      connection to the future expansion of the Community Center.  This future expansion
                                      will provide indoor activities and recreation.  Through thoughtful design and site   Budget:  $1,481,500
                                      layout, this master plan will allow for future expansion to both the Community
                                      Center and outdoor amenities.  The City of New Haven is thrilled to begin this next   Funding Partners:
                                      step in expanding their Community Center and can’t wait to see what the future   City of New Haven
                                      holds.                                                    Allen County – Fort Wayne Capital Improvement Board
                                                                                                Indiana Office of Community and Rural Affairs










                                   80




       EARR PLAN.indd   80                                                                                                                              11/13/18   10:48 AM
   75   76   77   78   79   80   81   82   83   84   85