S.   Raw   Approved   Rly  Relevant   Inspecting  Authority**  and   Acceptance criteria   Supplier’s   Verification  of  material  on
 No.   material   specification    BIS code    extent of inspection   responsibil  arrival   at   TPP/LKO
                                         ity
                                                        (No.TPP/Store/Material
                                                        Verification/01)


 6   Silicon   TPP/SIC/2017   IS:  11643-  Physical test, sampling, Send to  As  per  TPP  spec  no.  100%   Chalan, invoice, verification of
 Carbide   1985   LAB  for  chemical  analysis,  TPP/SIC/2017,   identification  on  drum,  seal,
 checking   weight,   sealing  Inspection  report  in   weight        and       physical
 drums  jointly  and  prepare  form   no.               verification     of     material
 inspection   report   as   per  TPP/SIC/2017/01        randomly.
 standard   form   no.  and  chemical  test
 TPP/SIC/2017/01   report from LAB***


 7   Steel   TPP/STCH/2017   IS   :2062-  Physical test, sampling, Send to  As  per  TPP  spec  no.  100%   Chalan, invoice, verification of
 Chips   2011   LAB  for  chemical  analysis,  TPP/STCH/2017,   identification  on  drum,  seal,
 Grade    checking   weight,   sealing  Inspection  report  in   weight   and   physical
 E-250   drums  jointly  and  prepare  form   no.       verification     of     material
 quality C   inspection   report   as   per  TPP/STCH/2017/01   randomly.
 standard   form   no.  and  chemical  test
 TPP/STCH/2017/01   report from LAB***




 (*) The supplier will purchase Aluminum Ingots from NALCO or BALCO or HINDALCO only and manufacture the blown Aluminium power to the approved
 specification- TPP/LKO/BAP/2017. The supplier will offer the prepared material as per approved specification- TPP/LKO/BAP/2017 along with copy of

 Invoice from NALCO or BALCO or HINDALCO as a proof of purchase of the raw material from these sources.
 (**) Inspecting authority shall be authorized representative of TPP/LKO.
 (***)Samples  shall  be  got  tested  at  “SHRIRAM  INSTITUTE  FOR  INDUSTRIAL  RESEARCH”19,  University  Road,  Delhi  for  chemical  &  metallurgical
 composition. The cost of all such testing will be borne by the firm only.