Page 57 - FINAL Phillips 66 50 Year Book
P. 57
(1986); Catalytic Cracker Turbo Expander commissioning and Gas Oil
Hydrotreater expansion (1987); Propylene Unit commissioning (1988);
and Alkylation Unit commissioning (1989).
Conoco headed towards the 1990s as it always had – looking to the
future with confidence and pride.
Purpose built roads and landing areas on the banks of the Humber
Estuary, North Killingholme to receive the refinery’s first Modular Units
used to build the Saturated Gas Plant.