Page 49 - Green Builder Jan-Feb 2021
P. 49

GREEN HOME OF THE YEAR AWARDS




                                                                                             KEY COMPONENTS:

                                                                                             ALTERNATIVE BUILDING SYSTEMS: Offsite construction;
                                                                                             panelized wall and roof systems by Blueprint Robotics;
                                                                                             Aerobarrier air barrier system by Northeast Aerobarrier
                                                                                             – 0.44ACH@50Pa
                                                                                             APPLIANCES: Sub-Zero, Gaggenau, Wolf, Miele,
                                                                                             RangeCraft custom hood
                                                                                             BUILDING ENVELOPE: Roof (Blueprint Robotics 18-inch
                                                                                             TJI structure, CCSF, Zip roof sheathing, EPDM system
                                                                                             with ISO tapered insulation to drain); Wall (Blueprint
                                                                                             Robotics prefabricated 2-by-6 framed wall with dense
                                                                                             pack cellulose insulation, Zip R9 sheathing, furring and
                                                                                             siding)
                                                                                             FOUNDATION: Frost protected shallow foundation –-
                                                                                             4-inch concrete slab with 6-inch sub slab, Type 9 EPS
                                                                                             insulation, and 4-foot EPS edge insulation
                                                                                             CABINETS, SHELVES, MILLWORK: Henrybuilt (kitchen);
                                                                                             Boffi (bathrooms)
                                                                                             CAULKS AND SEALANTS: Partel
                                                                                             COUNTERTOPS: Henrybuilt
                                                                                             DECKS: Cedar 1-by-6 with concealed fastener
                                                                                             DOORS AND HARDWARE: Flush Rift white oak; FSB
                                                                                             hardware
                                                                                             EXTERIOR FINISHES: 1-by-6 T&G vertical white cedar
                                                                                             siding; CUPACLAD slate shingle siding
                                                                                             FIREPLACE: Ortal 150 sealed combustion gas fireplace
                                                                                             FLOORING: Hudson Flooring rift white oak
                                                                                             FURNITURE: Kroll, Ikea, Room and Board, Vitsoe Shelving
                   Blending in. Decking made of FSC Certified cedar — known for its beauty, weather resistance and   GARAGE DOORS: Custom
                   bug repelling qualities — is a key component in Lang/St. Marie’s “at one with nature” design.  HOME CONTROLS: Lutron
                   CREDIT:JEFFREY TOTARO                                                     HVAC/DUCTS: Zehnder CA350 ERV and Mitsubishi
                                                                                             ductless minisplit; Electro Industries make-up air kit.
                                                             MAIN FLOOR PLAN                 INSULATION: Roof (CCSF in joist cavity, ISO tapered
                                                                                             insulation to drain on roof deck under EPDM); Wall
                                                                                             (dense pack cellulose insulation, Zip R9 sheathing);
                                                                                             Foundation (6-inch Type 9 expanded polystyrene
                                                                                             [EPS])
                                                                                             LANDSCAPING: Landscaping by Marsha Lea. Includes
                                                                                             boardwalk, bocce court, parking court paving
                                                                                             LIGHTING: Lutron lighting controls; Tech Lighting
                                                         KITCHEN                             pendant track in living room
                                                                           PATIO
                                                                                             PAINTS AND STAINS: Benjamin Moore zero VOC Aura
                                                                                             Interior Paint
                                                                                             PAVERS: Cobblestone
                                                                                             PLUMBING/PLUMBING FIXTURES: Julien, Dornbracht,
                                                                                             Evolution Excel, Fantini, Toto
                                             BATHROOM   DINING
                                                                                             RENEWABLE ENERGY SYSTEMS (SOLAR, WIND, ETC.):
                                                                                             7.5 KW roof-mounted photovoltaic (PV) system.
                                 ENTRY                                                       ROOF: EPDM roofing
                                                                                             STRUCTURAL COMPONENTS: Open web roof trusses
                                                                                             with glulam beams; 2-by-6 wall framing
                                                                                             TELECOMMUNICATIONS: Lutron
                      BEDROOM                            LIVING ROOM                         VENTILATION: Balanced ventilation using Zehnder
                                         BEDROOM
                                                                                             CA350 ERV
                                                                                             WATER HEATING: Rheem HWHP-Marathon
                                                                                             WATER MANAGEMENT (INDOOR/OUTDOOR): On site
                                                                                             WINDOWS, SKYLIGHTS, PATIO DOORS: Bildau &
                                                                                             Bussmann triple-pane, aluminum clad wood doors and
                                                                                             windows

                   www.greenbuildermedia.com                                                 January/February 2021 GREEN BUILDER  47




                                                                                                                                2/2/21   6:05 PM
          33-59 GB 0121 HOTY.indd   47
          33-59 GB 0121 HOTY.indd   47                                                                                          2/2/21   6:05 PM
   44   45   46   47   48   49   50   51   52   53   54