Page 36 - DarcyFowlerASLA
P. 36
COMMERCIAL
Commercial Landscape Design
Wells Fargo W
Landscape Design L
Conway, SC S
Wells Fargo
Landscape Design
Summerville, SC
Wells Fargo W
Landscape Design L
Myrtle Beach, SC S
TD Bank
Landscape Design
Weehawken, NJ
Design Notes: Planting Plan
3 SBG 1 CON
5 JPN
A ‘cow-path’ is the most direct and 1 CC 1 CON 1 PCC 2 TMD 3 SJP
therefore the most frequently used
pathway that a person will take to get
from point A to point B.
s Eye View The planters are informed by the
‘cow-paths’ which are used by TD
Bank customers when entering the
building from the existing sidewalks
and street intersection.
GL
with matte In order to improve aesthetic
ver water quality, create visual interest, and T3
complement the multi-level building
within the landscape, the planters GL
were designed using a tiered design Existing TD BANK
of four different levels. T2
ified by To Remain
ied by Planter levels to be tiered as indicated
on plan; levels are described below:
GL: Grade level T2
g areas. When T1: 6” above grade along edge of
planter.
Standard for
sery and T2: 1’ 10” above grade along edge of
planter, to be back filled with
son when soil specified by designer.
cal practice. T3: 3’ 0”above grade along edge of
planter, to be back filled with soil
planting. Water
o the extent specified by designer.
l continue at
om installation T2 T3
N Current Conditions Proposed Perspective Proposed Bird’s Eye View
SCALE: Current Conditions Proposed Perspective Proposed Bird’s Eye View
1/8” : 1’ 0”
Landscape Notes:
Existing 9 JPN 2 CON 2 JPN Existing Landscape Notes:
Pear Locust 1. Planter walls to be 6” in depth, made of fiberglass with gel-coating, black with matte
Tree to Tree to 1. Planter walls to be 6” in depth, made of fiberglass with gel-coating, black with matte
GL GL Remain Remain finish. finish.
2. Planters to be treated with 3” of double shredded hardwood bark mulch over water
Planting Schedule 2. Planters to be treated with 3” of double shredded hardwood bark mulch over water
permeable weed barrier fabric. permeable weed barrier fabric.
Key # Botanical Name Common Name Size (Height x Spread) Remarks
3. Planter levels to be tiered as indicated on plan.
TMD 2 TAXUS media 'Densiformis' Compact spreading yew 4’ x 4’ 5 gal 3. Planter levels to be tiered as indicated on plan.
PCC 1 Pyracantha coccinea ‘Chadwickii’ Firethorn 2’ x 12’ B/B GL: Grade level
JPN 16 Juniper procumbens ‘Nana’ Juniper procumbens ‘Nana’ 1’ x 10’ 2 gal GL: Grade level
CON 3 Chamaecyparis obtuse ‘Nana’ Dwarf Gold Thread Cypress 3’ x 3’ 3 gal T3 T3 T1: 6” above grade along edge of planter
T1: 6” above grade along edge of planter
SBG 3 Spirarea x bumalda ‘Goldflame’ Gold Flame Spiraea 3’ x 4’ 3 gal 35
T2: 1’ 10” above grade along edge of planter, to be back filled with soil specified by
SJP 3 Spirarea japonica ‘Little Princess’ Little Princess Spiraea 3’ x 3’ 3 gal T2: 1’ 10” above grade along edge of planter, to be back filled with soil specified by
CC 1 Cercis canadensis Eastern Red Bud 25’ x 25’ 4” caliper
designer. designer.
NOTE: IF ANY DISCREPANCIES OCCUR BETWEEN AMOUNTS SHOWN IN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE.
T3: 3’ 0”above grade along edge of planter, to be back filled with soil specified by
T3: 3’ 0”above grade along edge of planter, to be back filled with soil specified by
designer. designer.
4. New tree grate to match existing tree grate.
GL GL 4. New tree grate to match existing tree grate.
5. Contractor is required to provide a minimum 4“ topsoil layer for all planting areas. When
5. Contractor is required to provide a minimum 4“ topsoil layer for all planting areas. When
more than 4” of soil is needed the contractor will backfill with subgrade soil.
more than 4” of soil is needed the contractor will backfill with subgrade soil.
GL GL 6. All plants shall, in all cases, conform to the requirements of the “American Standard for
6. All plants shall, in all cases, conform to the requirements of the “American Standard for
Brushed Brushed Nursery Stock” (ANSI Z60.1), latest edition, as published by the American Nursery and
Nursery Stock” (ANSI Z60.1), latest edition, as published by the American Nursery and
Landscape Association.
Landscape Association.
Concrete Concrete T2 T2 7. Plantings should be performed during the periods within the planting season when
7. Plantings should be performed during the periods within the planting season when
weather and soil conditions are suitable and in accordance with accepted local practice.
weather and soil conditions are suitable and in accordance with accepted local practice.
Existing TD Bank Existing TD Bank Plants shall not be installed in topsoil that is in a muddy or frozen condition.
Plants shall not be installed in topsoil that is in a muddy or frozen condition.
8. New Plantings shall be adequately irrigated beginning immediately after planting. Water
to Remain to Remain 8. New Plantings shall be adequately irrigated beginning immediately after planting. Water
shall be applied to each shrub in such manner as not to disturb backfill and to the extent
shall be applied to each shrub in such manner as not to disturb backfill and to the extent
T2 T2 that all materials in the planting hole are thoroughly saturated. Watering shall continue at
that all materials in the planting hole are thoroughly saturated. Watering shall continue at
least until plants are established. least until plants are established.
9. Landscape Contractor shall guarantee plants for a period of (1) one year from installation
9. Landscape Contractor shall guarantee plants for a period of (1) one year from installation
GL Brushed Concrete GL Brushed Concrete
GL Brushed Concrete GL Brushed Concrete
T3
T3 T3
T3
T1
T1
General Notes:
1. This plan is to be unitized for landscape purposes only.
General Notes:
2. This plan has been designed by Image Resource Group, INC. to meet the landscape
1. This plan is to be unitized for landscape purposes only.
requirements of TD Bank. For the installation of landscaping show, on site landscaping shall
2. This plan has been designed by Image Resource Group, INC. to meet the landscape
be coordinated with the Landscape Architecture Department of the following office:
requirements of TD Bank. For the installation of landscaping show, on site landscaping shall
Image Resource Group Inc. be coordinated with the Landscape Architecture Department of the following office:
9010 Farrow Road
Columbia, SC 29203 Image Resource Group Inc.
803-790-2121 9010 Farrow Road
SCALE: Columbia, SC 29203 Existing Tree
3. All disturbed areas, excluding planting beds and street trees are to be installed as
803-790-2121
N 1/4” : 1’ 0” brushed concrete , unless otherwise stated on this plan. and Tree Grate
SCALE: Existing Tree
N 1/4” : 1’ 0” 3. All disturbed areas, excluding planting beds and street trees are to be installed as to Remain and Tree Grate
brushed concrete , unless otherwise stated on this plan.
to Remain