Page 36 - DarcyFowlerASLA
P. 36

COMMERCIAL









           Commercial Landscape Design


             Wells Fargo                                    W
             Landscape Design                               L
             Conway, SC                                     S


                                     Wells Fargo
                                     Landscape Design
                                     Summerville, SC




                                                                      Wells Fargo                                     W
                                                                      Landscape Design                                L
                                                                      Myrtle Beach, SC                                S




















                                                 TD Bank
                                           Landscape Design
                                             Weehawken, NJ
 Design Notes:  Planting Plan
                       3 SBG                1  CON
                         5  JPN
 A ‘cow-path’ is the most direct and   1 CC  1  CON                 1  PCC  2 TMD  3 SJP
 therefore the most frequently used
 pathway that a person will take to get
 from point A to point B.
 s Eye View  The planters are informed by  the
 ‘cow-paths’  which are used by TD
 Bank customers when entering the
 building from the existing sidewalks
 and street intersection.
            GL
 with matte   In order to improve aesthetic
 ver water   quality, create visual interest, and    T3
 complement the multi-level building
 within the landscape, the planters   GL
 were designed using a tiered design   Existing TD BANK
 of four different levels.   T2
 ified by                            To  Remain
 ied by   Planter levels to be tiered  as indicated
 on plan; levels are described below:
     GL:  Grade level  T2
 g areas.  When       T1:   6”  above grade along edge of
             planter.
 Standard  for
 sery and       T2:  1’ 10” above grade along edge of
             planter, to be back filled with
 son when               soil specified  by designer.
 cal practice.       T3:  3’ 0”above grade along edge of
            planter, to be back filled with soil
 planting. Water
 o the extent              specified by designer.
 l continue at
 om installation             T2            T3
               N                  Current Conditions                               Proposed Perspective                     Proposed Bird’s Eye View
              SCALE:   Current Conditions                             Proposed Perspective                   Proposed Bird’s Eye View
              1/8” : 1’ 0”
                                                                                                   Landscape Notes:
                            Existing  9  JPN  2  CON  2  JPN  Existing                Landscape Notes:
                            Pear               Locust                                              1. Planter walls to be  6” in depth, made of fiberglass with gel-coating, black with matte
                            Tree to            Tree to                                1. Planter walls to be  6” in depth, made of fiberglass with gel-coating, black with matte
 GL     GL                  Remain             Remain                                 finish.      finish.
                                                                                                   2. Planters to be treated with 3” of double shredded hardwood bark mulch over water
 Planting Schedule                                                                    2. Planters to be treated with 3” of double shredded hardwood bark mulch over water
                                                                                      permeable weed barrier fabric.  permeable weed barrier fabric.
 Key   #   Botanical Name         Common Name       Size (Height x Spread)   Remarks
                                                                                                   3. Planter levels to be tiered  as indicated on plan.
 TMD   2   TAXUS media 'Densiformis'      Compact spreading yew    4’ x   4’         5 gal  3. Planter levels to be tiered  as indicated on plan.
 PCC   1   Pyracantha coccinea ‘Chadwickii’   Firethorn         2’ x 12’         B/B                   GL:  Grade level
 JPN   16   Juniper procumbens ‘Nana’      Juniper procumbens ‘Nana’    1’ x 10’         2 gal       GL:  Grade level
 CON   3   Chamaecyparis obtuse ‘Nana’      Dwarf Gold Thread Cypress    3’ x   3’         3 gal  T3  T3      T1:  6”  above grade along edge of planter
                                                                                                       T1:  6”  above grade along edge of planter
 SBG   3   Spirarea x bumalda ‘Goldflame’     Gold Flame Spiraea      3’ x   4’         3 gal  35
                                                                                                       T2:  1’ 10” above grade along edge of planter, to be back filled with soil specified by
 SJP   3   Spirarea japonica ‘Little Princess’    Little Princess Spiraea      3’ x   3’         3 gal      T2:  1’ 10” above grade along edge of planter, to be back filled with soil specified by
 CC   1   Cercis canadensis         Eastern Red Bud       25’ x 25’         4” caliper
                                                                                      designer.    designer.
 NOTE:  IF ANY DISCREPANCIES OCCUR BETWEEN AMOUNTS SHOWN IN THE PLAN AND THE PLANT LIST, THE PLAN SHALL DICTATE.
                                                                                          T3:  3’ 0”above grade along edge of planter, to be back filled with soil specified by
                                                                                                       T3:  3’ 0”above grade along edge of planter, to be back filled with soil specified by
                                                                                      designer.    designer.
                                                                                                   4.  New tree grate to match existing tree grate.
                                                          GL           GL             4.  New tree grate to match existing tree grate.
                                                                                      5.  Contractor is required to provide a minimum 4“ topsoil layer for all planting areas.  When
                                                                                                   5.  Contractor is required to provide a minimum 4“ topsoil layer for all planting areas.  When
                                                                                      more than 4” of soil is needed the contractor will  backfill with subgrade soil.
                                                                                                   more than 4” of soil is needed the contractor will  backfill with subgrade soil.
                                  GL          GL                                      6.  All plants shall,  in all cases, conform to the requirements of the “American Standard  for
                                                                                                   6.  All plants shall,  in all cases, conform to the requirements of the “American Standard  for
                                  Brushed     Brushed                                 Nursery Stock” (ANSI Z60.1), latest edition, as published by the American Nursery and
                                                                                                   Nursery Stock” (ANSI Z60.1), latest edition, as published by the American Nursery and
                                                                                      Landscape Association.
                                                                                                   Landscape Association.
                                  Concrete    Concrete T2       T2                    7.  Plantings should be performed during the periods within the planting season when
                                                                                                   7.  Plantings should be performed during the periods within the planting season when
                                                                                      weather and soil conditions are suitable and in accordance with accepted local practice.
                                                                                                   weather and soil conditions are suitable and in accordance with accepted local practice.
                                                                    Existing TD Bank  Existing TD Bank  Plants shall not be installed in topsoil that is in a muddy or frozen condition.
                                                                                      Plants shall not be installed in topsoil that is in a muddy or frozen condition.
                                                                                      8.   New Plantings shall be adequately irrigated beginning immediately after planting. Water
                                                                      to Remain     to Remain      8.   New Plantings shall be adequately irrigated beginning immediately after planting. Water
                                                                                      shall be applied to each shrub in such manner as not to disturb backfill and to the extent
                                                                                                   shall be applied to each shrub in such manner as not to disturb backfill and to the extent
                             T2         T2                                            that all materials in the planting hole are thoroughly saturated. Watering shall continue at
                                                                                                   that all materials in the planting hole are thoroughly saturated. Watering shall continue at
                                                                                      least until plants are established.  least until plants are established.
                                                                                      9.   Landscape Contractor shall guarantee plants for a period of (1) one year from installation
                                                                                                   9.   Landscape Contractor shall guarantee plants for a period of (1) one year from installation
                              GL Brushed Concrete                    GL Brushed Concrete
                                          GL Brushed Concrete                      GL Brushed Concrete
                                                                                                   T3
                                                                                           T3                    T3
                                                                                                         T3
                                                T1
                                                            T1
                        General Notes:
                        1. This plan is to be unitized for landscape purposes only.
                                   General Notes:
                        2. This plan has been designed by Image Resource Group, INC. to meet the landscape
                                   1. This plan is to be unitized for landscape purposes only.
                        requirements of TD Bank. For the installation of landscaping show, on site landscaping shall
                                   2. This plan has been designed by Image Resource Group, INC. to meet the landscape
                        be coordinated with the Landscape Architecture Department of the following office:
                                   requirements of TD Bank. For the installation of landscaping show, on site landscaping shall
                        Image Resource Group Inc.  be coordinated with the Landscape Architecture Department of the following office:
                        9010 Farrow Road
                        Columbia, SC 29203  Image Resource Group Inc.
                        803-790-2121  9010 Farrow Road
            SCALE:                 Columbia, SC 29203                                        Existing Tree
                        3. All disturbed  areas, excluding planting beds and street trees are to be installed as
                                   803-790-2121
        N 1/4” : 1’ 0”  brushed concrete , unless otherwise stated on this plan.             and Tree Grate
                       SCALE:                                                                              Existing Tree
                   N 1/4” : 1’ 0”  3. All disturbed  areas, excluding planting beds and street trees are to be installed as   to Remain  and Tree Grate
                                   brushed concrete , unless otherwise stated on this plan.
                                                                                                            to Remain
   31   32   33   34   35   36   37   38