Page 149 - POSP
P. 149

2018         2019          2020
   Acct     Location         Project                                                                   Revised       Budget        Budget
       7110 Grounds Maint    Mowing reduction - planting  spread around to other facilities
       7110 Grounds Maint    MH Court yard fixtures                                                      $5,000
       7110 Retzer           Boardwalk Upgrades 2016 design                                             $20,000        $10,000 $           10,000
       7110 Expo             Circuit Panel replacement                                                  $14,000
       7110 Expo             Replace gates 1,2,3
       7110 Fox Brook        Diving Dock Replacement                                                                            $           18,000
       7110 Fox Brook        Concrete Repairs / Mud jacking                                              $7,500
       7110 Fox Brook        Overlook Railing Repairs/Replacements                                                              $              6,500
       7110 Fox Brook        Shoreland Erosion Protection                                                $5,000         $5,000 $              5,000
       7110 PARKS            Informational Highway Rec signage                                                                  $              5,000
       7110 Fox River        Canoe launch - overlook/fishing area (Design in 2019)                                              $           30,000
       7110 Minooka          Pave gravel parking lot at Sunny Slope and NB Trail
       7110 Minooka          Erosion control by Poplar Creek (2018 design Alan and staff)
       7110 Mukwonago        Accessible fishing Pier on Roxy Pond (Funding?)                                           $65,000
       7110 Mukwonago        Update landscape around the office
       7110 Mukwonago        Bridge Across Ravine Along Nature Trail
       7110 Mukwonago        Solar powered well for DEA
       7110 Mukwonago        Repair of Concrete Channel from Barn to Pond                                                       $              7,500
       7110 Mukwonago        Dam Structure Erosion Repair at School Section                              $3,500
       7110 Mukwonago        Dam Structure Repair/Replacement - stop boards (lake drawdown)              $2,500
       7110 Mukwonago        School Section Boat Ramp Improvements (Partial grant 50%)                  $25,000
       7110 Mukwonago        Beach House Demolition                                                     $23,000
       7110 Mukwonago        Outdoor shower facility                                                     $5,000
       7110 Mukwonago        ADA Archery Facility (Partial grant funding 75%)                           $10,000
       7110 Mukwonago        Old Concession Stand (Storage Building)  Demolition                         $7,000
       7110 Muskego          SNA Trail improvements - Boardwalks and signage
       7110 Muskego          remove outhouse / use porta potties                                         $2,000
       7110 Muskego          Observation Deck in Scientific Area
       7110 NagaWaukee       Playground resilient surface per playground specs                                         $28,500
       7110 NagaWaukee       Nagawicka Launch Piers - safety issue                                      $30,000




                                                                         Exhibit A-3-5
   144   145   146   147   148   149   150   151   152   153   154