Page 804 - 2006 HARLEY FLSTCI SERVICE MANUAL
P. 804

3-17

                               When this step is completed during top end service, you may advance to  TOP END OVERHAUL: ASSEMBLY if no other work is to be done.  Inspect and repair as necessary.  See 3.20 BREATHER ASSEMBLY.  *  Inspect and repair as necessary.  See 3.21 ROCKER ARM SUPPORT   *  Inspect and repair as necessary.  See 3.22 PUSH RODS, LIFTERS AND   *  Inspect and repair as necessary.  See 3.23 CYLINDER HEAD.  *  Inspect and repair as necessary.   *  Inspect and repair as necessary.   See 3.25 PISTON.  Inspect and repair as necessary.  See 3.26 UPPER CONNECTING   ROD.  2006 Softail: Engine
                                 3.17


















                                    *                               PLATE.       COVERS.                 See 3.24 CYLINDER.







              ENGINE REMOVED FROM CHASSIS





                               Remove engine from motorcycle. See  3.14 REMOVING ENGINE FROM CHASSIS.  Start 3.16 TOP END OVERHAUL: DISASSEMBLY.  Remove and repair subassembly components as necessary.  Remove  BREATHER  ASSEMBLY. See page 3-27.  Remove ROCKER ARM SUPPORT  PLATE. See page 3-28.  Remove  PUSH RODS, LIFTERS AND  COVERS. See page 3-29.   Remove CYLINDER  HEAD. See page 3-30.   Remove CYLINDER.   See page 3-31.   Remove PISTON.  See page 3-33.   Complete all appropriate steps under  3.17 TOP END OVERHAUL: ASSEMBLY.   Install engine in motorcycle.  See 3.15 INSTALLING ENGINE IN CHASSIS.


















          HOME
   799   800   801   802   803   804   805   806   807   808   809