Page 21 - JTI Profile_2019_English
P. 21
JTI Profile
Industrial millwright skills
Overview Career OPPOrtunitieS
Industrial Millwright Skills program is designed to train After successfully completing the training period, the
students to be multi-skills technicians and work-ready in graduate will be qualified for one of the following jobs:
any industrial environments. After learning the fundamen- Maintenance Technician
tals of work safety and responsibilities, measurements, Rotating/Stationary Equipment Technician
drawings and specifications, standards and procedures, Preventive Maintenance Technician
devices and tools, students then involved in a wide vari- Vibration Analyst/Technician
ety of practical training such as lift and move heavy loads,
installing, maintaining, repairing and overhauling different
types of equipment ranging from pumps, valves, turbines, degree Plan
tanks, heat exchangers and others. As Millwright techni-
cians, students have to complete the metal fabrication first semester
course which covers property of materials, lathe work, introduction to maintenance
drilling, grinding, power saw, Arc welding and Gas cutting. industrial Blueprint reading
metal Fabrication
In the second semester, students learn how to monitor machine elements
and analyze vibrations, perform alignment with different mechanical power transmissions
methods and techniques, and troubleshoot hydraulic and rigging & Hoisting
pneumatic systems. second semester
Industrial Millwright Technicians ensure that the ro- Hydraulics & pneumatics
tating and stationary equipment are running at maximum machine alignment
efficiency by adjusting, dismantling, repairing and replac- stationary equipment
ing parts when needed. rotating equipment
prime movers
Vibration analysis
coop (15 Weeks)
cooperative training program
www.jti.edu.sa 21