            To understand the way RoadCem works we have to take a look at the repetitive loads which are typical for roads

            when in use; assuming we have a cyclic dynamic loading which is acting through the asphalt to the road base



                                                           What does this mean for road construction using RoadCem?


                                                           The first thing is that the base layer needed is just a single RoadCem layer which can be constructed using in-

                                                           situ  material  from  the  existing  sub-soils  or  from  recycled  road  materials.  That  means  that  both  time  and

                                                           money will be saved in the construction process.


                                                           The use of RoadCem will also increase the modulus of elasticity and the flexibility of the base, so that the

                                                           following advantages are realised:-


                                                           Looking again at our segment, which is loaded by force “F”. The factor “a” means that because of the higher


                                                           modulus of elasticity a higher load is now needed to cause the same amount of deflection. This is the first

                                                           advantage of using RoadCem.


                                                           After  the load  has  passed  the  segment,  no  deformation  will  remain,  because  of  the  high  flexibility  of  the

                                                           RoadCem base. Typically a RoadCem stabilised material has 3 times longer durability than conventional road

                                                           construction – meaning 3 times longer maintenance intervals.