Page 133 - permit book
P. 133
MINIMUM RESIDENTIAL SITE PLAN REQUIREMENTS
(Note: Incomplete Site Plan Submittals will not be accepted for review)
PROJECT NAME: ________________________________ LEGAL ADDRESS: ________________________________
Project name
Site address or Legal description
Date of Site Plan
Arrow showing true North
Scale
Legend
All property lines with dimensions
Location, type and dimensions of all Easements and Setbacks
All proposed structures noting dimensions, square footage, and type of use for each structure (e.g. house, garage, etc.)
Dimensions between all proposed structures and to all property lines
Location, dimensions and type of proposed driveways
State all FEMA related flood zones or areas and Base Flood Elevation, if applicable
If existing features are to remain undisturbed (driveways, structures, etc.) clearly label as “Existing to Remain.”
I have reviewed the above minimum Residential Site Plan Submission requirements and certify that the plan submission contains all
required information and documents necessary for review. I acknowledge upon review of the application, additional information, documents
or permits may be required;
__________________________________ __________________________________
Authorized Applicant (Print Name) Company Name
__________________________________ __________________________________
Signature Date