NORTH REGION OF VIETNAM Feeder Terminals
TAN CANG - 189 TERMINAL
Address Convenient Traffic, connected to the Total area : 105,000 sqm
national highway No 5, No. 10, No 18...
Dinh Vu IP, Dong Hai coming across the Northern provinces Container yard area : 8,000sqm
Ward, Hai An District, and the nation. 7km away from Hai Number of berth : 1
Hai Phong City Phong existing railway station and 1.4 Berth length : 160m
km downstream away from the new to accommodate
railway station. vessels from 10.000
Dinh Vu is the convergence of large DWT capacity (future)
estuaries and also a focal point of the Channel chart datum :-7.6 m
domestic waterways and coastal road Depth alongside : 8.2m
which is going to connect to Quang berth
Ninh province and to the whole of the
Northern midland Turning basin : 210m
Vessel capacity : up to 15,000 DWTs
Throughput capacity : 300,000 MTs -
Equipment 400,000 MTs
01 gantry crane 240,000TEUs
02 fixed quayside crane
05 RTG
Reefer plugs: 216
TAN CANG - 128 TERMINAL
Address Total area: 165,000sqm Channel chart datum: -6.2m
Ha Doan, Dong Hai Container yard area: 107,000sqm Depth alongside berth: -8.2m
ward, Hai An District, Warehouse area: 5,000sqm Turning basin: 210m
Hai Phong City Number of berth: 1 + 1 barge berth Vessel capacity: 15,000 DWT
Berth length: 422 m Throughput capacity: 300,000teus
Equipment
07 slewing cranes
08 RTG
Reefer plugs: 500