Page 15 - ebook
P. 15

13 - Project Proposal
        ACCEPTANCE










        To Proceed with this Project, required to take the following steps,


               Accept the proposal “as is” or discuss desired changes.
               Finalize and sign contract.


        Once these steps have been completed I wil begin the project.










                                                                                            21/11/2018
        Signed By:............................                                  Date:............................
        Mr.Lakmal Perera
        (Lecturer of Web Designing Program)
        Sri Lanka Institute of Printing
        118, Dr Danister De Silva Mawatha,
        Colombo, Sri Lanka.
   10   11   12   13   14   15   16   17