Page 27 - EOSedge installation Documents
P. 27
EOS 9XXXX-Template layout for gantry’s floor anchors
f. Unlike Part 1, there is only one diameter to be concerned with. There
is a total of 8 holes to drill: 4X for the Lateral Generator and 4X for
the Gantry frame.
g. They all require 8mm holes (M6 HKD drop-in anchors).
h. When you finish drilling all the holes, make sure you blow out any
debris inside the hole.
i. Drive in the drop-in anchors into their respective holes and lock them
in using a “prop-in tool”, if available.