Specification Sheet
Pattern Name: Model Number:
Reclaimed wood 2 C1 byōbu RCW-011-P10-B Care & Cleaning:
RAVAdesign panels can be dusted with a soft cloth or soft brush vacuum attachment.
for cleaning a finished panel use a mild soapy water solution. Please refer to your paint
manufacturer's cleaning instructions.
Pattern Direction Thickness
Pattern Direction Construction & Fabrication:
as it relates to the RAVAdesign panels must have the front, back & edges sealed prior to installation. Cutting
panel.
the panel with any finish may cause splintering or chipping of the finish. Verification of
outside finished dimension is required prior to manufacturing. The core product will have
an uneven color appearance in each panel and will have uneven color from panel to
panel. Once the panel is clear coated with lacquer or latex the uneven discoloration will
become more apparent. If fire rated core is required, then an additional up-charge will be
incurred. Fire rated core may have an “orange” tint / color. Due to this color, clear
L8 L10 P8 P10 coating will enhance this color and is not recommended.
1 1 1 1 Suggested panel installation methods:
RAVAdesign does not install products and is not liable for any third party design,
engineering, installation services or products. A licensed professional contractor and/or
painter should be consulted to determine the best installation method for your project.
Due to manufacturing methods used to produce RAVAdesign panels, most panels will
Panel Size: 4' x 8'=_08, 4' x 10'=_10 have a slight "bow" or "warping" in them. This bow or warping is considered normal and
Panel Core Thickness Suffix: can be removed using the suggested installation method listed
.75"=A 1.0"=B 1.5"=C
Z-Clips
Z-Clips should run the entire width of the panel so as to provide support for the entire
panel. At least three (3) rows of full width Z-Clips should be used for a standard 4’ x 8’
panel. The rows of Z-Clips should be positioned at the top, bottom and center of each
panel to provide even support for the entire surface of the panel.
Direct Screw
If panels are being attached by screwing through the face of the panel into the wall
substrate, the panel should be pre-drilled and countersunk to accommodate the screws.
The screw holes should then be filled with a non-shrinking type of filler. This application
method should only be used on panels that are finished after installation.
Construction adhesive
Follow the construction mastic manufacturer’s application instructions. Cover the back of
the panel generously and allow for cure time. The entire panel must be held in place until
the mastic is completely dry to insure a satisfactory installation.
Panel content Environmental & LEED:
RAVAdesign panels are manufactured in Maryland, within 500 miles of the majority of
Project Name: the east coast population. LEED MRc5.1. All panel cores are exclusively sourced from a
FSC® Mix Credit Certified supplier. All panel cores are exclusively sourced from a
Location: supplier, documented to SCS Recycled Content Standard V7-0 for a Minimum 92% Pre-
Consumer Recycled Wood Fiber Content. The material quantification and mass-balance
Item name: Item #:
calculations are completed on a dry-weight basis. Panels are primed with a water based
primer. Factory finish utilizes water based paints.
Finish: Sq.Ft: