                    SHOOT TYPE: UNDERGROUND UTILITY EXACT -BUILT                                     ®


                    An elementary school’s sewer line was discovered to be improperly installed. Solving the
                    problem would have required the removal, replacement, and compaction of 8,000 yards
                    of soil.

                                                                        ®
                    Using Multivista Underground Utility Exact-Built  photographs, a workaround
                    option to install two additional sewer lines along alternate paths was identified and
                    undertaken, with the original installation simply abandoned in place. The client indicated a
                    savings exceeding $400,000 as a result.




                                           $400,000 SAVINGS