Return on Investment
SHOOT TYPE: UNDERGROUND UTILITY EXACT -BUILT ®
An elementary school’s sewer line was discovered to be improperly installed. Solving the
problem would have required the removal, replacement, and compaction of 8,000 yards
of soil.
®
Using Multivista Underground Utility Exact-Built photographs, a workaround
option to install two additional sewer lines along alternate paths was identified and
undertaken, with the original installation simply abandoned in place. The client indicated a
savings exceeding $400,000 as a result.
$400,000 SAVINGS