Page 298 - Civil Engineering Project Management, Fourth Edition
P. 298

Plate 15a.
                                                                 are always liable to fill with rainwater.
                                                                 A sump should have been excavated
                                                                 beside each to permit dewatering before
                                                                 concreting  Column base excavations





















































                          Plate 15b.  Sand runs on a concrete wall surface