Page 38 - Auction Catalog 2018 FINAL
P. 38
Live Auction
12 Bathroom Remodel
La Salle has assembled multiple professional contractors to give you the bathroom
you’ve always wanted! These alumni and parents have committed their time and talents
to remodel your standard three-piece bathroom -- keeping the original footprint. Project
estimate for up to 50 square feet. Our fantastic team includes demolition, electric, plumbing,
carpentry, drywall, tile and paint specialists. You’ll also get products from Keidel, including
a tub and shower trim, lavatory faucet, complete toilet, and lavatory bowl, towel bars, towel
rings, soap dispenser, robe hooks and toilet paper holder.
All contractors’ time must be mutually agreed upon. TDG Facilities will act as project
manager. Any work above and beyond the scope should be discussed with each contractor.
• Kevin Casey Construction demolition includes a standard bathroom demolition.
Excludes removal of asbestos, lead, or poured concrete floors or walls.
• Ed Kramer ‘66, with CabitDesign, will provide two hours of bathroom design.
• Mike Hambrick, Master Electrician, will install four can lights, 1-2 vanity lights including
wiring, three switches, one outlet GFI protected, wiring for exhaust fan, wiring for
devices, boxes and recessed lights. Does not include decorative fixtures, exhaust fan or
duct for fan, or new circuits for fan.
• Kevin Casey Construction will provide the plumbing labor and materials to set sink,
toilet and shower/tub valve. Fixtures separate. See Keidel Supply Company notes below.
• Keidel Supply Company accessories include tub and shower trim (faucets), lavatory
faucet, complete toilet, lavatory bowl and various accessories including towel bars,
towel rings, soap dispenser, robe hooks, toilet paper holder, etc. Keidel will deliver to
homeowner.
• Father and son, Ernie Petri ‘64 and Ernie Petri ‘89, will install drywall for the bathroom
remodel.
• James Schoenlaub Painting includes sealing any new drywall, painting ceiling, painting
walls (two coats), two doors and any trim needing painting for a standard three-piece
5x8 bathroom.
• Mees Distributors will provide up to 50 square feet of floor tile.
• Rick Weller will provide eight hours of labor to install up to 50 square feet of tile.
• Steve Dangel Carpentry includes setting vanity and trim carpentry.
Thank you to all of these contractors who are giving their time and resources to this project
as a donation to La Salle High School!
Bathroom is non-transferrable. Winner will pay for any additional charges and should discuss add-ons at
the planning stage.
Thanks to: Andy Hemsath - Keidel Supply Company, Ed Kramer ‘66 - CabitDesign, Inc.,
Ernie Petri ‘64 - EJP’s Capentry, Ernie Petri ‘89 - E&A Contractors, James Schoenlaub ‘75
- Painter, Kevin Casey ‘85 - Kevin Casey Construction, Mike Hambrick - Mike Hambrick
Electric, Rick Weller ‘79 - Weller Tile, Steve Dangel ‘84 - Steve Dangel Construction, Mike
Hausfeld ‘87 - TDG Facilities Services
38