Page 198 - Energi Persada
P. 198

PT.Surya Semesta Cemerlang
 MANUFACTURE DRAWING   ORDER NO.   TYPE.   PART NO.   WORKING SQUENCE.  010 -----  020 -----  030  -----  040  -----  050  060  070  DESTINATION
 -----
                                                         SHOP.
  TITLE.   MASTER PART.   MATERIAL.   CUTTING SIZE.  ----   DATE SCHEDULE.
 Mounting-10x410WP  -----  Assý
  DRAWING NO.   QTY/SET.   SHOP NAME.
 -----  1   TIME ESTIMATE.
  SPECIAL INSTRUCTION.  STANDART PROJECTION REV  DATE  PREPARED BY APPROVED BY   TIME ACTUAL RECORD.
  JIS  V   A  0  03/08/2022 Nur  BOWO
  JIG/TEMPLATE NO.   PAINT COLOUR.   DATE FINISHED.
  UIC   E
                              NO.     DESCRIPTION  QTY (Pcs) Weight (kg)
  2024
                               1       Kaki-Depan    2      8.2
  2024
            6
                               2      Kaki-Belakang  2      6.2
  1515    1270                 3     Rafter UNP Ass'y  2   15.5
 1  4   830   5   812          4    Siku 40x40x1480mm  2    2.7
                               5    Slide Rail 4700mm  4   5.48
                               6       End Clamp     8     0.02
              2
 DETAIL O                      7      Midle Clamp    16    0.04
 SCALE 1 : 50
                               8   Solar Cell 410WP-SKY  10  8,5
                               9       Bolt M8x25    16    0.02
                               10       Nut M8       16    0.01













  5200
        3000
                    O




  3500    2500
   193   194   195   196   197   198   199   200   201   202   203