Page 29 - Energi Persada
P. 29

Pekerjaan Piping System (Fuel, Cooling Water, Lube oil, Fire Figh ng,
            FM 200, Treated Water) termasuk Pipe rack dan support

            - PLTMG Ambon Peaker 30 MW  +/- 9.000 InDia

            - PLTMG Jayapura Peaker 40 MW +/- 14.000 inDia


            - PLTMG Bau Bau 30 MW +/- 8.000 InDia






            PENGALAMAN PERUSAHAAN PIPING SYSTEM                                                             26
   24   25   26   27   28   29   30   31   32   33   34