Page 72 - puget sound energy community energy programs
P. 72

Chapter 7



               Figure 35          Temporary underground service installation



                                                    1
                                                                   TOP OF METER BASE SHALL NOT
                                                                   BE ABOVE TOP OF STRUCTURE
                                               8

                                                  3



                                                                             2



                                                               6' MAX
                                                               5' PREFERRED
                                                               4' MIN
                                                   5'
                                                  MAX              4


                                         7
                                               2' MIN COVER
                                                               3' MIN
                                                                            5


                                                 6









                        Items owned and installed by customer           Items owned and installed by PSE
                      1   4" x 4" x 10' continuous single structure  7  Transformer, handhole, pedestal, or
                          2" x 4" bracing (post should be braced from   stubout
                      2
                          two directions)                           8   Meter
                          Meter socket and distribution panel (up to
                      3
                          200 A, 120/240 V)
                      4   Ground wire, in accordance with NEC/WAC
                      5   Ground rod(s), in accordance with NEC/WAC
                          Service entrance conductors in accordance
                      6
                          with NEC













               Electric Service Handbook 2017 — Single-Family Residential Projects                          63