Page 72 - puget sound energy community energy programs
P. 72
Chapter 7
Figure 35 Temporary underground service installation
1
TOP OF METER BASE SHALL NOT
BE ABOVE TOP OF STRUCTURE
8
3
2
6' MAX
5' PREFERRED
4' MIN
5'
MAX 4
7
2' MIN COVER
3' MIN
5
6
Items owned and installed by customer Items owned and installed by PSE
1 4" x 4" x 10' continuous single structure 7 Transformer, handhole, pedestal, or
2" x 4" bracing (post should be braced from stubout
2
two directions) 8 Meter
Meter socket and distribution panel (up to
3
200 A, 120/240 V)
4 Ground wire, in accordance with NEC/WAC
5 Ground rod(s), in accordance with NEC/WAC
Service entrance conductors in accordance
6
with NEC
Electric Service Handbook 2017 — Single-Family Residential Projects 63