Page 118 - Area 8 PPP
P. 118

EXTENT OF COMPLIANCES WITH TEAM RECOMMENDATIONS FOR AREA VIII – THE PHYSICAL PLANT
           AND FACILITIES IN THE LAST SURVEY VISIT

                                                                                           PERCENTAGE
              AACCUP    ACCREDITORS’ RECOMMENDATION                    ACTION
                                                                                           COMPLIANCE
                                                             The Quality plan of the University
                                                             ensures  the  availability  and
           It is suggested that fire extinguishers should be periodically   management  of  facilities  and
           checked  to  identify  expired  fire  extinguishers  and  make
           sure that the gas is at the right pressure to extinguish fire   equipment  including  the  conduct    100%
                                                             of  periodic  check  for  fire
           in case of emergency.
                                                             extinguishers  to  identify  expired
                                                             and those that needs refill.
                                                             Buildings   at   Isabela   State
                                                             University   are   insured   as
           To  assure  safety  of  building  occupants  and  visitors,  it  is  compliance  to  assure  safety  and
           recommended  that  Certificate  of  Occupancy  should  be  protection  of  facilities  of  the    100%
           secured and posted in every building              university. Insurance Certificate of
                                                             buildings  is  present  at  the
                                                             University Supply Office.
                                                             The  Isabela  State  University
                                                             assures  that  there  is  enough
                                                             Budgetary  Allocation  for  the
           If  the  budget  permits,  laboratory  rooms  should  be   expansion,   maintenance   and
           constructed  with  two  doors  opening  outward  to  ensure   construction of new buildings and    100%
           faster movement in case of emergency,
                                                             facilities.   For  the  program’s
                                                             laboratory  an  approved  budget
                                                             was allocated for repair.
                                                             The Isabela State University Main
           The  administration  may  allocate  a  budget  for  the  Campus  was  able  to  provide
           construction of the student center to cater to the needs of  budget  for  the  construction  of
           the students and if possible, the center should be located  Student Center. The said center is    100%
           in a strategic location of the campus to be accessible to all  conveniently located in front of the
           students.                                         administration  building  making  it
                                                             more accessible to all students


















                    ======================================================================================
                     117 | P a g e - OBQA-PPP / Area VIII: Physical Plants and Facilities/BSE
   113   114   115   116   117   118   119