Page 545 - 6118-AEW-XX-XX-NBS-A-001_Neat
P. 545
930 NOTICES AND INSTRUCTIONS
• Standard: In accordance with BS 6440 Appendix A.
• Emergency lift evacuation procedure: Include within building health and safety
file.
• Wall mounted single line diagrams: Required.
- Content: Describe the power distribution system serving the lift. Include power
sources, points of isolation and device ratings.
• Circuit charts for switchgear associated with the lift system: Required.
• Instruction manual: Required.
- Content: Drawings and diagrams necessary for normal use of the lift, emergency
use, rescue, maintenance, repair and periodic checking.
• Maintenance instructions: To BS EN 13015.
935 EQUIPMENT LABELLING
• Switches, controls, enclosures and terminations: Clearly and indelibly label
describing their purpose. Identify the off position.
940 SPARES AND CONSUMABLES
• Supply the following spares:
- Deliberately operated devices: 2 of each type.
- Detectors: 2 of each type.
- Protective switches: 2 of each type.
- Lamps for enclosure or lift car lighting: 2 of each type.
970 DOCUMENTATION
• Operation and maintenance instructions: Submit.
• Record drawings: Submit.
• Certificates: Submit.
- Number of copies: 2.
• Instruction manual: Submit.
- Number of copies: 2.
• Log book: Individual for each lift.
- Type: Hard back cover embossed with the lift name and unique lift identification
reference with A4 lined paper, minimum 100 pages.
975 TRAINING
• Timing: Before completion.
• Scope to include:
- Daily lift operation.
- Routine and general maintenance.
- Emergency passenger release procedure.
980 MAINTENANCE
• Servicing and maintenance: Undertake.
Duration: Until 12 months after Practical Completion.
RotF generic (intermediate) NBS 2014 6118-AEW-XX-XX-NBS-A-01