PARTICULAR ELECTRICAL SPECIFICATION
                                 Version 2014-2


                      The Electrical Contractor will use the Architects’ fire route drawing to determine the
                      appropriate quantity and location of escape signs, escape signage provisions will comply
                      with the requirements of BS 5266.

               1.7.7  Fire Alarms

                      Detection and alarms are to be provided for all areas of the store, the Electrical Contractor
                      will determine the most appropriate number and location of detectors, alarm sounders and
                      break glass units to meet the requirements of BS5839-1.

               1.7.7.1  Kitchen and Counter Area

                      Detectors in the kitchen area will be fixed temperature type.

                      Additional sounders will be provided in the kitchen area to maintain the minimum alarm
                      level 5dB (A) above ambient.


               1.7.8  The Counter

               1.7.8.1  Power Distribution

                      The Electrical Contractor will provide cabling, sockets and fused connection units for the
                      connection of till equipment as indicated on the digital equipment installers’ drawings or
                      otherwise as indicated by the Technical Specifications for Electrical Installations Generally.

                      Sockets will be installed flush in dado trunking supplied  and fitted  with the counter  by
                      others.

               1.7.8.2  Hearing Loop

                      The electrical Contractor will install a hearing loop at the  counter as described in the
                      Technical Specifications for Electrical Installations Generally.

               1.7.8.3  Lighting


                      The Electrical Contractor will call-off the quantities and types of luminaires required to
                      complete the lighting installation. The Contractor is reminded  to place the order for the
                      luminaires as early as possible, as some fittings are on long delivery.

                      Counter lighting will be as indicated on the Architects’ reflected ceiling plan.


                      Lighting over the counter will be circuited with the lobby lighting for control purposes, unless
                      otherwise agreed with the Project Manager.

                      The Electrical Contractor will determine the number and location of luminaires in the
                      Architects lighting layout that are to be fitted with emergency conversion packs to meet the
                      requirements of BS 5266.