Page 120 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 120
5.3 Standard Drawings NOTE: If the opening is to 550mm Weathered upstand, nominally
be made before DPG 150mm high.
contractors are on site clear If on a pitched roof, then
then a temporary opening upstand should be 150mm
weatherproof covering high on the uphill side and
should be provided by the correspondingly higher on the
roofing contractor. down hill side..
ROOF CONSTRUCTION
3 February 2016 500mm diameter circular HVAC
duct with weathering cravat
- by Domino's contractor Std Roof Opening Upstand Deta il
Domino's Pizza UK & Ireland Ltd Man - 30 June 2005
1 Thornbury
West Ashland PY N.T.S.
Milton Keynes
MK6 4BB