Page 120 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 120

5.3 Standard Drawings  NOTE: If the opening is to  550mm    Weathered upstand, nominally
                       be made before DPG                   150mm high.
                       contractors are on site     clear    If on a pitched roof, then
                       then a temporary            opening  upstand should be 150mm
                       weatherproof covering                high on the uphill side and
                       should be provided by the            correspondingly higher on the
                       roofing contractor.                  down hill side..

                                                            ROOF CONSTRUCTION

3 February 2016        500mm diameter circular                                                               HVAC
                       duct with weathering cravat
                       - by Domino's contractor                                                              Std Roof Opening Upstand Deta il

                                                                            Domino's Pizza UK & Ireland Ltd  Man - 30  June 2005
                                                                                              1 Thornbury
                                                                                             West Ashland         PY    N.T.S.

                                                                                            Milton Keynes
                                                                                                 MK6 4BB