Page 3 - B8773-AEW-XX-XX-PP-A-0001_[P1]_Contractors Manual
P. 3

Introduction

The purpose of this document is to provide             The contractor’s fabrication and installation
both the Franchisee and the Shopfitting                drawings must not deviate from the
contractor with a clearly defined statement            requirements defined on the Clients
of requirements for a model typical store.             approved plans without prior approval.
This also enables an accurate cost to be
established and a consistent corporate                 Where for any reason the shopfitting contractor
image to be achieved and maintained.                   identifies a need to vary the provision, this
                                                       must only be done with the express written
The use of descriptive text, schedules of              permission of Domino’s Pizza UK & Ireland Ltd.
information, detail drawings and generic
standard details is intended to fully illustrate       Any reference to Building Control, Building
the corporate imaging and quality                      Regulations, Planning Permissions, British
requirements required by Domino’s Pizza UK             Standards, and similar Statutory Bodies, should
& Ireland Ltd on behalf of the franchisee.             be taken to refer equally to the equivalent
                                                       Scottish and Irish national institutions, and
This document is intended to form a detailed           compliance is mandatory in the same way.
design brief to the shop fitting contractor who
will prepare his own fabrication and installation
drawings, where required, and to provide a
fixed cost for the fit-out of a Domino’s Pizza store.
   1   2   3   4   5   6   7   8