        C3 Shopfitting






        C3.1 Stud Walls

        New studwork walls  to be constructed  from           Wall bottom track to be set 20mm off the floor
        Gyproc MF proprietary system to suit the              level, seated on a 20mm concrete  particle
        scenario. Stud sizing, centres, fixing details and    board sole plate. Wall boards to be set 15mm
        all other  details should be as manufacturers         off the floor level to avoid capillary action prior
        recommendations contained in The White Book:          to any finishes being installed.


        http://www.british-gypsum.com/~/media/                Stud wall boards facing into  new presenter
        Files/British-Gypsum/WHITE-BOOK/WHITE-BOOK-           booths should be balance laminate with sealed
        Partition-Wall-Systems-Section.pdf                    PVC edges (to prevent capillary action) ready
                                                              for final graphic decoration.
        All walls to  be  suitably retained  at  the  head
        back to soffit.