Page 422 - B6118-AEW-XX-XX-PP-A-0001_(P13)_Contractors Manual 010118_Neat
P. 422

CONSTRUCT





       C3 Shopfitting






       C3.1 Stud Walls

       New studwork walls  to be constructed  from            Wall bottom track to be set 20mm off the floor
       Gyproc MF proprietary system to suit the               level, seated on a 20mm concrete  particle
       scenario. Stud sizing, centres, fixing details and     board sole plate. Wall boards to be set 15mm
       all other  details should be as manufacturers          off the floor level to avoid capillary action prior
       recommendations contained in The White Book:           to any finishes being installed.


       http://www.british-gypsum.com/~/media/                 Stud wall boards facing into  new presenter
       Files/British-Gypsum/WHITE-BOOK/WHITE-BOOK-            booths should be balance laminate with sealed
       Partition-Wall-Systems-Section.pdf                     PVC edges (to prevent capillary action) ready
                                                              for final graphic decoration.
       All walls to  be  suitably retained  at  the  head
       back to soffit.






















































        C3.1           Stud Walls                           2.0                        09 February 2017
   417   418   419   420   421   422   423   424   425   426   427