C3 Shopfitting






          C3.27  Isolated Floor Repairs (Modular Buildings)

          When dealing with the existing modular building       7. Under  the  grills and fryers an 8mm Durbar
          estate  it  is  possible  that  existing  floor  damage   plate should  be  bedded  on  X78s adhesive
          may be uncovered  as part of a EotF  project.           to become flush with the top of the tiles. This
          Where such is identified, the following procedure       plate should be bent to form a skirting at the
          must be followed:                                       back of the grills / fryers to match the depth of
                                                                  the skirting tiles. The Durbar should not project
          1. Remove  damaged /  affected  tiles ensuring          further  than 100mm  from the grills  / fryers
            ALL adhesive from the floor is removed; if the        wheels / legs. All Durbar plates to be screwed
            tiles are close to the baseboard, include the         to the floor (min 4no/ plate) and to have an
            removal of the baseboard tiles.                       epoxy grout between the Durbar and the floor
          2. Ensure exposed board is clean and dry. If in         tiles and a recommended silicone between
            doubt conduct a core test to ensure board is          the wall and the skirting tiles.
            suitably dry and stable.                            8. The  skirting  tiles should  be bedded above
          3. Check  for  damage  to  existing  floor  boards      the  new  floor  level  by  6mm  to  allow  for  full
            and replace as necessary, and then remove             injection of recommended silicone 6mm thick
            all loose dust and debris.                            to the full depth of the skirting tile. The gap
          4. When timber door frames are installed,  cut          above the skirting tile should be filled with a
            the door frame back 6mm above the new tile            cut tile and grouted as per normal wall tiling.
            level to allow new tiles to pass under the door     9. All floor and skirting tiles to be grouted to a
            frame and allow 6mm thick bed of silicone full        full depth of the tile with an Ardex EG8 epoxy
            depth between the floor tile underside of the         grout and the floor left in a clean state.
            door frame leg.
          5. The  existing  board should be thoroughly          Where practical, replacement ceramic tiles
            cleaned and primed with Ardex P4 primer.            should be pre-drilled prior to installation.
          6. The floor tiles should be laid on a solid bed of
            Ardex X78s. The proprietary movement joint          *Please  note,  repair  work  of  this nature  must
            should be bedded up off the X78s adhesive           take place in a closed environment  ensuring
            to match the top surface of the tiles and an        a  minimum  of  6-8  hours  before  foot  traffic  is
            Ardex  EG8 epoxy grout  joint between  tile         allowed otherwise the integrity of the fix could
            and  movement  joint  is required.  The  laying     be compromised.
            of  the  tiles should  be  as manufacturers
            recommendations  and voids  under the tiles
            will not  be tolerated.  (E.G The  comb effect
            left by the trowel MUST be eliminated).
















          C3.27          Isolated Floor Repairs (Modular Buildings)  2.0                 15 January 2016