Page 57 - Installation Training Binder FIT1-3
P. 57
Step 7 – Floor Anchors
A. Drill holes to 1” depth
B. Insert floor anchors and set with punch
C. Install Barrier wall and tighten bolts securely.
Drill to 1” depth Tighten Securely
Image Provided by: EnviroGuard TM
D. Continue to install remaining barrier walls as per CAD diagram
Note: Barrier bolt head and washers do not require sealant on liner systems.