Page 3 - Hot Mix Asphalt VMC-3192
P. 3

Lime Silo                                                        Silo top baghouse required and functioning.






         • Silo top baghouse required and functioning.
         • Observe silo when being filled.
         • No visible emission allowed.
         • Inspect for leaks.
         • All transfer points to be sealed.



                                 All transfer points to be sealed.                 No visible emission allowed.











                                                                                         Observe silo when being filled.








                                           Inspect for leaks.






                                                                                                                                     Inspect for leaks.