Page 3 - Hot Mix Asphalt VMC-3192
P. 3
Lime Silo Silo top baghouse required and functioning.
• Silo top baghouse required and functioning.
• Observe silo when being filled.
• No visible emission allowed.
• Inspect for leaks.
• All transfer points to be sealed.
All transfer points to be sealed. No visible emission allowed.
Observe silo when being filled.
Inspect for leaks.
Inspect for leaks.