Page 9 - Hot Mix Asphalt VMC-3192
P. 9

Containment






         • Plan frequent cleanup for spillage.
         • Fix leaks in hot oil lines upon detection.                                                               Inspect for cracked, leaking or
         • Inspect for cracked, leaking or damaged tanks.                                                           damaged tanks.
         • Install bathtubs in frequent drip areas.















                                                         Fix leaks in hot oil lines upon detection.







                                                                                                                  Plan frequent cleanup for spillage.
   4   5   6   7   8   9   10   11   12   13   14