Page 12 - Ready Mix VMC-3194
P. 12

Cement Silo                                                      Silo top baghouse required and functioning.






         • Silo top baghouse required and functioning.
         • Observe silo when being filled.
         • No visible emission allowed.
         • Inspect for leaks.
         • All transfer points to be sealed.


                                 All transfer points to be sealed.                 No visible emission allowed.












                                                                                         Observe silo when being filled.








                                           Inspect for leaks.





                                                                                                                                     Inspect for leaks.
   7   8   9   10   11   12   13   14   15   16   17