Page 74 - 143 Macquarie Street Main
P. 74
PROJECT DEVELOPMENT AND SERVICES 8.2 Cost Estimate (continued) DESCRIPTION OF WORKS/FUNCTIONAL USES GFA UNIT RATE - ROUNDED (AU$) TOTAL (Excl GST) ELECTRICAL SERVICES Allow for upgrading existing mains with un-metered mains to each floor for suit multiple tenants (included with electrical services for Upgrading Offices) Allow to install tenant DBs to all floors (included with electrical services for Upgrading Offices) Allow for MATV system to be installed Allow for removal of wire wound frame Allow for modifications of access control and CCTV systems HYDRAULIC SERVICES Allow for the booster pumps to be replaced (Note: Allowance only as specification and quantity unknown) Allow for the HWS replaced and upgraded to suit enlarged EOT facilities (Note: Allowance only as specification of existing and scope of upgrade unknown) $72,000 $114,000 $18,000 $4,000 $11,000 $18,000 $8,000 12 Level $6,000 12 Level $9,500 1 Item $18,000 1 Item $4,000 1 Item $11,000 Sub Total - Electrical Services $219,000 1 Item $18,000 1 Item $8,000 Sub Total - Hydraulic Services $26,000 74