Page 96 - NYSAPLS-Conference-Journal_2021-FINAL2_Neat
P. 96
AVERAGE SAVINGS OF IN 2000, THE FEDERAL HIGHWAY ADMINISTRATION
ESTIMATED THAT FOR EACH $1.00 SPENT ON
$4.62 PERFORMING VARIOUS SUE SERVICES RELATED TO
STATE AND FEDERAL TRANSPORTATION PROJECTS,
PER $1.00 SPENT THERE WAS AN OVERALL PROJECT SAVINGS OF
$4.62 (PER DOLLAR SPENT).
SUBSURFACE UTILITY ENGINEERING
QUALITY LEVEL QUALITY LEVEL QUALITY LEVEL QUALITY LEVEL
A B C D
UTILITY LOCATING UTILITY DESIGNATION SURVEYING UTILITY DATA COLLECTION
NON-DESTRUCTIVE AIR METHODS GEOPHYSICAL METHODS FOR SURVEY OF VISIBLE, ABOVE GROUND CONTACT UTILITY OWNERS
FOR PRECISE HORIZONTAL APPROXIMATE HORIZONTAL SURFACE FEATURES INCLUDING: FOR RECORD INFORMATION
AND VERTICAL POSITIONS POSITIONS Electric, gas, communications, fiber
» Vacuum excavation » Electromagnetics » Valves optic, water distribution, chilled
water, storm and wastewater, cable
» Hand excavation » Pipe & cable locaters » Hydrants TV, steam, and more.
» Sondes » Pull boxes » Public agencies
» Ground penetrating radar » Manholes » County clerk offices
» Telephone pedestals » Landowners
FOR MORE INFORMATION, PLEASE CONTACT
Andrew H. Clevenger, Project Manager
andrew.clevenger@kci.com
(315) 849.3500
www.kci.com | ISO 9001:2015 Certified