Page 7 - SIP Autumn/Winter
P. 7
Propane Space Heaters
Propane Space Heaters
230 V MADE IN
SUPPLY ITALY
09284
09281
09281 09284
SIP Fireball Wheel Kit
09284
09283
09281 09282 09283 09284 SIP Fireball Wheel Kit
Fireball 365 Propane Fireball 635 Propane Fireball 1070 Propane Fireball 1600 Propane For models:
Fireball 1070, 1600, 1071DV,
230v (13amp) 230v (13amp) 230v (13amp) 230v (13amp) 1602DV, 2261DV.
36,500 BTU/hr (10.7 kW) 38,841 to 63,500 BTU/hr 51,787 to 107,000 BTU/hr 74,202 to 160,000 BTU/hr
(11.4 to 18.6 kW)
(21.7 to 49.6 kW)
(15.2 to 31.4 kW)
3
3
3
3
245m (8,652 cu/ft) 426m (15,044 cu/ft) 718m (25,355 cu/ft) 1074m (37,927 cu/ft)
0.65 kg/hr 0.74 to 1.21 kg/hr 1 to 2 kg/hr 1.45 to 2.98 kg/hr
Powder-Coated Powder-Coated Powder-Coated Powder-Coated
5.5 kg 5.9 kg 13.1 kg 14.7 kg
£119.99 ex. VAT £149.99 ex. VAT £199.99 ex. VAT £239.99 ex. VAT
£143.99 inc. VAT £179.99 inc. VAT £239.99 inc. VAT £287.99 inc. VAT
LIST PRICE £242.40 ex. VAT
LIST PRICE £331.20 ex. VAT
LIST PRICE £389.00 ex. VAT
LIST PRICE £204.60 ex. VAT LIST PRICE £242.40 ex. VAT LIST PRICE £331.20 ex. VAT LIST PRICE £389.00 ex. VAT
LIST PRICE £204.60 ex. VAT
Propane Space Heaters - 230v / 110v (Dual Voltage) Item No: 09285
£36.99 ex. VAT
£44.39 inc. VAT
LIST PRICE £66.80 ex. VAT
SIP Fireball Wheel Kit
SIP Fireball Wheel Kit
F For model: Fireball 2901DV.or model: Fireball 2901DV.
For increased manoeuvrability
For increased manoeuvrability
and allows for heaters to be
and allows for heaters to be
stacked for increased heat
stacked for increased heat
output in confi ned spaces.
output in confi ned spaces.
09278
09278
09278
Fireball 3711DV Propane
Fireball 3711DV Propane
230v (13amp) / 110v
230v (13amp) / 110v
158,767 to 371,000 BTU/hr
158,767 to 371,000 BTU/hr
(46.5 to 108.7 kW)
(46.5 to 108.7 kW)
3
2490m (87,934 cu/ft) (87,934 cu/ft)
3.09 to 6.89 kg/hr
Stainless Steel
28.5 kg Item No: 09286
£42.99 ex. VAT
£649.99 ex. VAT
£51.59 inc. VAT
£779.99 inc. VAT
LIST PRICE £1,086.80 ex. VAT
LIST PRICE £1,086.80 ex. VAT LIST PRICE £71.20 ex. VAT
7
SIP-Autumn-Winter-2018-Draft.indd 7 10/09/2018 09:58