Page 12 - Corru Jan- June20 final3
P. 12
BOILER Pure
t
d i Consultancy,
u
A
l CONSULTANT x
a Product Sale,
m
e r h T - A Contract,
Royalty
#23 DIFFERENT BOILER PROJECTS
To Study Boiler, Heating System: Provide Report For:
Generation Area Energy Conservation
Distribution Area Overcoming Bottleneck
Utilisation Section
Return/Recovery Area Modification/Altration
/Up-gradation
CONSULTANCY SERVICES TYPE OF INDUSTRIES
(PROJECT MANAGEMENT)
From Concept Stage to Plant Commissiong
Energy Saved
till now ` 5 Cr./Annum.
Our Mission to Save
` 10 Cr./Annum
by year 2025.
Steam Trap Checking, Trouble Shooting of Heating
Machine Automation for Heating Systems
Energy saving is a serious profession.
Burn your worries with us, not the SURPLUS FUEL.

