Page 15 - The HandPrint_September-October
P. 15

As of October 2018, GOJO Wooster Campus has over 100 full-time and 50+ temporary team members
              employed in Distribution Center alone. The GOJO Wooster Campus Distribution Center team provides
              logistics support to manufacturing operations and blow molding operations. The GOJO Wooster Campus
              Distribution Center houses the Distribution Control Center, which manages the day-to-day operations of
                                                                                our distribution network to ensure
                                                                                streamlined shipping and distribution
                                                                                of GOJO products to customers.

                                                                                GOJO Wooster Campus has 20
                                                                                operational dock doors with 1400
                                                                                pick-fronts. A pick front is a pallet
                                                                                position in the warehouse that is
                                                                                systemically set up to allow for case
                                                                                orders to be picked from for
                                                                                customer shipments. GOJO
                                                                                Wooster Campus utilizes dynamic
                                                                                pick fronts, which means if there is
               Pictured above: Wooster Distribution Control Center              no demand for the product, that

              pallet is cycled out dynamically pallets of higher demand products are cycled in the pick fronts. Pick
              fronts can change daily.



              Pictured below, left and right: Dynamic pick fronts






















              This is an exciting time for GOJO, as the addition of the GOJO Wooster Campus facility and operations
              prepares us to capitalize on our strategy of efficient and effective fulfillment. Thank you to the many
              GOJO team members who worked to make this project successful!




                                                                                                           15
   10   11   12   13   14   15   16