Page 178 - C:\Users\azizu\Documents\Flip PDF Professional\Matematics-Form-1-1\
P. 178

Haze is a phenomenon that happens when small particles exist in large quantities in the
                  air. These could block the sunlight from reaching the Earth, hence impairing visibility.
                      Write a report in the form of an essay about the haze
                  phenomenon that includes the following.                         Scan the QR Code and
                                                                                 visit http://apims.doe.
                  •  The causes of haze.                                         gov.my/v2/ to help
                  •  The effects of haze.                                        you in preparing
                  •  How does the Air Pollution Index (API) act as a guide       the report.
                    to identify the quality of the air?
                  •  The level  of haze  that  occurred  in your area  and the
                    preventive measures taken following that incident.










                  In an amusement park, fixed revenue is generated from advertising sponsors whereas          CHAPTER
                                                                                                              7
                  fixed expenses incurred is the maintenance cost of the machines. Besides that, variable
                  revenue is the number of visitors who  visit the amusement park whereas variable
                  expenses is the employees’ wages.  An operations manager needs to estimate  the
                  operating expenses and revenues to ensure that the amusement park obtains a profit.

                      The table below shows the daily expenses and revenues estimated by the operations
                  manager of an amusement  park which offers 12 rides. Copy and complete  the
                  information in the table below.

                                                     Daily expenses
                   Total variable operating cost per visitor                   RM30
                   Total fixed cost (RM10 000 + RM2 500 per ride)


                                                     Daily revenues
                   Admission ticket per visitor                                RM76
                   Food per visitor                                            RM50
                   Souvenirs per visitor                                       RM30
                   Parking per visitor                                         RM5
                   Total variable revenues per visitor

                   Fixed revenue from sponsors                                 RM8 000
                      Construct and solve the inequalities to determine the minimum number of visitors
                  needed to visit the amusement park per day in order to obtain a profit.
                  Interpret your solutions.


                                                                                                       167
                                                                                 Linear Inequalities



       07 TB Math F1.indd   167                                                                       11/10/16   12:16 PM
   173   174   175   176   177   178   179   180   181   182   183