Page 19 - Brie Equity Brochure for Web_Neat
P. 19

Renovation - WARNERS BAY









                               Renovated in July 2015 this suburban home now boasts a new
                               kitchen, ensuite and bathroom.


                               With imported tiles and quality bathroom fixtures and fittings,
                               the result is outstanding.


                               The kitchen designed and drawn by Brie Equities was installed
                               by their joiner over the newly laid Victorian Ash floor boards.

                               The removal of the laundry wall and installation of new structural
                               beams initiated some design specific bulkheads which in turn,
                               accommodated the extent of the cupboards.


                               The new laundry is a continuation of the kitchen cupboards
                               integrated into the black and white design


                               In all, the renovation took 4 months but I’m sure you will agree,
                               the result is outstanding.
   14   15   16   17   18   19   20   21   22   23   24