Page 6 - Welch Terrace_12
        P. 6
     
       	HOME IMPROVEMENTS & FEATURES
12 WELCH TERRACE
2014-2011
 New water heater
 Finished portion of Lower Level (’11)
 Installed new staircase to Lower Level (’11)
2009-2007
 New deck
 New furnace
 All duct work fully cleaned
 New upstairs bathroom (’08)
 Basement System installed, French drain
along perimeter, replaced two 10 ft
sections of basement foundation (’07)
2003-2001
 House sided
 Central air installed (’02)
 New front door (’01)
 New back door (’01)
 New front steps (’01)
 All new windows (’01)
www.VANDERBLUE .com 203-259-8326
       
     12 WELCH TERRACE
2014-2011
 New water heater
 Finished portion of Lower Level (’11)
 Installed new staircase to Lower Level (’11)
2009-2007
 New deck
 New furnace
 All duct work fully cleaned
 New upstairs bathroom (’08)
 Basement System installed, French drain
along perimeter, replaced two 10 ft
sections of basement foundation (’07)
2003-2001
 House sided
 Central air installed (’02)
 New front door (’01)
 New back door (’01)
 New front steps (’01)
 All new windows (’01)
www.VANDERBLUE .com 203-259-8326

