O7 IITGN-UL/Façade  O8 IITGN-UL/Façade




 ABSTRACT  Use of external façade systems in buildings is increasing day                was constructed as part of this project to study fire behavior at
                                                                                        full-scale in different scenarios.  Both external and internal fire
         by day primarily due to their significant role in enhancing the
                                                                                        spread mechanisms were investigated in a series of four full-scale
         energy efficiency and appearance of  the building. There is,
         however, a downside of using a façade system – its
                                                                                        tests performed in  the months of December 2016 and January
         susceptibility to fire hazards. Recent building fires have shown
         how a façade system can cause damage to an entire building                     2017.
         in the event of a fire. For instance, fire in a textile showroom at            The experiments provided several interesting insights into  the
         Chennai on June 1 caused the entire façade system to collapse                  behavior of different façade materials: glass, aluminium
         during fire and inflicted serious irreparable damage  to  the                  composite panels, medium density fiberboards, structural
         structural system. Consequently, the entire building is being                  sealants and aluminium frames as well as structural fire
         demolished now. More recently, the June 14 fire in the Grenfell                protection systems involving plaster of paris boards, cement
         building, London was entirely a consequence of  the façade                     boards and masonry walls. The experiments demonstrated how
         system. The fire reportedly started due  to malfunction of a                   quickly fire can reach from one floor  to  the other (through  the
         refrigerator in one of  the rooms and engulfed  the entire                     so-called leap-frog effect as well as  through internal spreading
         building within no  time due  to  the fire spread aided by its                 due to failure of fire stop material) and showed the importance of
         newly installed façade system. One can go on finding such                      proper workmanship in installation of fire protection materials.

         incidents in  the past and it can be said  that fire safety                    The experiments unearthed several new phenomena that need
         requirements of green building materials are not understood                    further investigation such as uncracked bending of constrained
         properly.                                                                      glass panels during fire, intact falling out of glass panels during
                                                                                        fire from aluminium frame, better performance of MDF over ACP,
         This provided motivation for  taking up  the present project                   potential of the insulating material of ACP to initiate secondary
         dedicated towards studying fire spread mechanisms in façade                    fires at ground level, and rapid increase in the ventilation factor of
         buildings. As has been observed in previous fire incidents,                    a compartment in  the event of façade failure  that further
         knowing the behavior of individual components of a façade                      intensifies compartment fire. Each one of these warrant further
         system is not sufficient to reliably predict its fate in a real fire.          in-depth investigations both at the small and the large scales.
         Hence, a three-storey three-compartment full-scale building