Page 24 - 20161207 TOG Master Plan Vision
P. 24
1 2 3 4 5 6 7 8 9
DESIGN WORKSHOP
Landscape Architecture Land Planning
Urban Design Tourism Planning
Asheville Aspen Austin Denver Lake Tahoe
120 East Main Street
Aspen, Colorado 81611
A
(970)-925-8354
Facsimile (970) 920-1387
NOTE: Design and implementation of future
Visitor/Transit Center to be coordinated W W W . D E S I G N W O R K S H O P . C O M
with appropriate agencies including CDOT,
FHWA, ECO Transit, and Town of Gypsum.
B
Dog Run Area I-70 EASTBOUND OFF-RAMP
GYPSUM PARKWAY
Parking
C CORRIDOR IMPROVEMENTS GYPSUM, COLORADO
Ornamental Grass Type 3
Ornamental Grass Type 1
Playground
Picnic Pavilion
Lawn Visitor Center Native Re-vegetation
Proposed Evergreen Trees
Oversized Vehicular Parking
D
(Potential Future ECO Transit Area)
US HWY 6
ISSUE DATE: October 25, 2014
REVISIONS
1
Proposed Deciduous Tree 2
3
Improved Crosswalk with 4
Change in Pavement 5
6
E 7
DRAWN: MS/ DC REVIEWED: KJ
SCHEMATIC
DESIGN
PROJECT NUMBER: 5057
F
0’ 10’ 20’ 40’ SHEET NUMBER
L-01
SCALE 1:20 NORTH PLAN BY DESIGN WORKSHOP, GYPSUM PARKWAY CORRIDOR
IMPROVEMENTS PACKAGE, OCTOBER 25, 2014
1 2 3 4 5 6 7 8 9 C C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
13
TOWN OF GYPSUM MASTER PLAN VISION FUTURE VISITOR/TRANSIT CENTER 12.07.2016 | 24