Page 3 - Copy of template for newsletter MARCH 2020
P. 3

A Letter From Tony




                                                Head Golf Professional



     February saw no rain and fantastic golf course conditions and it was


     great to see so many of you out playing.




     Around this time we have received most the new product from the


     different club manufacturers and we have  plenty demos available

     for use .  We have the Titleist SM8 wedges, Taylormade Sim metals,


     Callaway Maverick metals to name a few.  Please remember that we


     have a Flightscope launch monitor which is a great tool used by your

     professionals for fittings.




     March 2nd will we be the start of the range renovation project. We


     will begin to remove the old surface and 2” of contaminated soil,


     incorporate 2” of new soil and till that in 4” deep. Then we will level

     and install new drainage/irrigation along with a permanent synthetic


     strip. Once this work has been completed the tee will be reseeded.

     While this is happening there will be disruption to the practice


     facilities. Both sides of the driving range will be closed from March


     2nd – 9th to allow the process to begin and for the safety of the

     construction workers. The short game and putting green will be


     open during this time.
   1   2   3   4   5   6   7   8