9.3.3  Supporting information

      Depending on the nature of the scheme                     ■  Thames Water consent to discharge to
      various investigations, tests and calculations            public sewer if sewer connection is

      may need to be performed along with                       required.   Refer to Thames Water advice
      obtaining necessary consents:                             on the process required to apply for               Detailed Design
                                                                discharge consent.
         ■  Ground investigation, including infiltration
                                                                ■  Proposed maintenance schedule and
          test results, soil testing and groundwater
          monitoring as appropriate.                            confirmed management arrangements for
                                                                all non adopted drainage.  Identify any
         ■  Design calculations which demonstrate
                                                                proposed split of the SuDS between
          compliance with the design criteria for the
                                                                private (curtilage) and public (open space
          site including all hydraulic and structural
                                                                or highway) land.
          calculations for permeable pavements
          and underground storage structures as                 ■  Designers hazard and risk assessment- to
          appropriate.                                          consider construction, maintenance and
                                                                operation by personnel and day to day
         ■  Completion of standard design
                                                                site use by public.
          information forms as may be provided by
          the LPA.                                              ■  Details of any informative signage
                                                                proposed for SuDS.
         ■  Details of any offsite works required,

          together with any necessary consents in
          place (or can be obtained).
                                                                                                                   72
         ■  Confirmation that discharge consents are

          in place (or can be obtained):
          Environmental Permit (Environment
          Agency) - an Environmental Permit may
          be required for works in, under, over or
          near a main river (including where the
          river is in a culvert), works on or near a
          flood defence or for works in the flood
          plain of a main river; Ordinary
          Watercourse Consent (LLFA) for any
          structure with the potential to affect flows
          in an ordinary watercourse; or highway
          drain (Highways Authority). Discussions
          should be held with EA for Infiltration
          within Source Protection Zone areas or
          higher risk sites; Local Authority and

          Inland Drainage Board byelaws,
          comments and constraints.